: Edexcel past-paper questions pack
Back to the topic page

Vectors: intersections, angles and shortest distances

Past-paper questions pack

Name
Class
Date set
Date due
Score/ 55

Questions are numbered; the mark schemes (the answer key) follow on separate pages so the question pages can be handed out alone. www.alevelfurthermathstutor.com

Edexcel AS and A-level Further Maths past-paper questions since June 2018 · 17 parts, 55 marks · mark schemes follow the questions · www.alevelfurthermathstutor.com · Questions and mark schemes © Pearson Education Ltd

1. June 2025 · AS Paper 1 (Core Pure) · Q9(a) · 2 marks
9. An engineer detects a source of water below the surface of the ground. The engineer models the situation relative to a fixed origin O. In the model • the surface of the ground is a plane Π with equation x – 2y + 8z = 1 • the source of water is at a point W with coordinates (6, –2, –4) where the units are metres. (a) Use the model to determine the shortest distance from W to the surface of the ground. (2)
2. June 2025 · AS Paper 1 (Core Pure) · Q9(b) · 1 marks
(b) By considering the model, comment on whether the answer to part (a) is reliable, giving a reason for your answer. (1)
3. June 2025 · AS Paper 1 (Core Pure) · Q9(c) · 3 marks
To access the water, a hole is drilled, in a straight line, from a point P on the surface of the ground to W. Given that the length of the hole needs to be as short as possible, (c) determine the coordinates of P, according to the model. (3)
4. June 2025 · AS Paper 1 (Core Pure) · Q9(d) · 1 marks
Given that the actual length of the hole drilled is 2.52 metres, (d) use the answer to part (a) to evaluate the model, giving a reason for your answer. (1)
5. June 2025 · Paper 2 (Core Pure 2) · Q2(a) · 2 marks
2. An archer shoots an arrow towards a target. In a model • the arrow is a particle • the flight path of the arrow is a straight line • the target is part of a plane Relative to a fixed origin O • the arrow is fired from the point with position vector 3 i j k • the plane containing the target has equation 2 x y z Use the model to answer parts (a) to (d). (a) Determine the shortest distance that the arrow must travel to reach the plane. (2)
6. June 2024 · AS Paper 1 (Core Pure) · Q6(d) · 5 marks
(d) the shortest distance between pipes P1 and P2 (5)
7. June 2023 · Paper 1 (Core Pure 1) · Q5(a) · 2 marks
5. The line l1 has equation x y z The plane Π1 has equation 2x + 3y – 2z = 6 (a) Find the point of intersection of l1 and Π1 (2)
8. June 2023 · Paper 1 (Core Pure 1) · Q5(b) · 5 marks
The line l2 is the reflection of the line l1 in the plane Π1 (b) Show that a vector equation for the line l2 is : : r O û where μ is a scalar parameter. (5)
9. June 2022 · AS Paper 1 (Core Pure) · Q6(d) · 3 marks
The net of the tennis court lies in the plane r. j = 0 (d) Find the position of the tennis ball at the point where it is in the same plane as the net. (3)
10. June 2022 · Paper 2 (Core Pure 2) · Q8(c) · 3 marks
The position of the nest is modelled as being at this common point. The tree containing the nest is in a park. The ground level of the park is modelled by the plane with equation 2x – 3y + z = 2 (c) Hence determine the shortest distance from the nest to the ground level of the park. (3)
11. Nov 2021 · Paper 1 (Core Pure 1) · Q7(c) · 4 marks
The line l has equation r = - + t - where t is a scalar parameter. The point A lies on l. Given that the shortest distance between A and Π is 2 29 (c) determine the possible coordinates of A. (4)
12. Oct 2020 · Paper 1 (Core Pure 1) · Q4(b) · 3 marks
The line l has equation x y z - - + = = - (b) Find the coordinates of the point of intersection of l with Π1 (3)
13. Oct 2020 · AS Paper 1 (Core Pure) · Q4(e) · 2 marks
The point R (2, 5, 2.75) lies on the washing line. (e) Determine, according to the model, the shortest distance from the point R to the lawn, giving your answer to the nearest cm. (2)
14. Oct 2020 · AS Paper 1 (Core Pure) · Q4(f) · 1 marks
Given that the shortest distance from the point R to the lawn is actually 1.5 m, (f) use your answer to part (e) to evaluate the model, explaining your reasoning. (1)
15. June 2019 · AS Paper 1 (Core Pure) · Q4 · 5 marks
4. The line/ has equation The plane /7 has equation r.(i—2j+k) =—7 Determine whether the line / intersects /7 at a single point, or lies in /7, or is parallel to /7 without intersecting it. (5)
16. June 2019 · AS Paper 1 (Core Pure) · Q8(b) · 7 marks
The equation of the plane modelling the side of the mountain is 2x +3y—5z =300 The company wants to create a new accessway from this side of the mountain to the pipeline. The accessway will consist of a tunnel of shortest possible length between the pipeline and the point M(100, k, 100) on this side of the mountain, where & is a constant. (b) Using the model, find (1) the coordinates of the point at which this tunnel will meet the pipeline, (ii) the length of this tunnel. (7)
17. June 2018 · AS Paper 1 (Core Pure) · Q4(b) · 6 marks
A point C(–1, –2, 0) lies on the road. A section of water pipe needs to be connected to W from C. (b) Using the model, find, to the nearest cm, the shortest length of pipe needed to connect C to W. (6)

Mark schemes

Each mark scheme shows the whole question; the parts on this topic are the ones listed above.

June 2025 · AS Paper 1 (Core Pure) · Q9
Mark scheme June 2025 Paper 1 (Core Pure) Q9(d)
June 2025 · Paper 2 (Core Pure 2) · Q2
Mark scheme June 2025 Paper 2 (Core Pure 2) Q2(a)
June 2024 · AS Paper 1 (Core Pure) · Q6
Mark scheme June 2024 Paper 1 (Core Pure) Q6(d)
June 2023 · Paper 1 (Core Pure 1) · Q5
Mark scheme June 2023 Paper 1 (Core Pure 1) Q5(b)
June 2022 · AS Paper 1 (Core Pure) · Q6
Mark scheme June 2022 Paper 1 (Core Pure) Q6(d)
June 2022 · Paper 2 (Core Pure 2) · Q8
Mark scheme June 2022 Paper 2 (Core Pure 2) Q8(c)
Nov 2021 · Paper 1 (Core Pure 1) · Q7
Mark scheme Nov 2021 Paper 1 (Core Pure 1) Q7(c)
Oct 2020 · Paper 1 (Core Pure 1) · Q4
Mark scheme Oct 2020 Paper 1 (Core Pure 1) Q4(b)
Oct 2020 · AS Paper 1 (Core Pure) · Q4
Mark scheme Oct 2020 Paper 1 (Core Pure) Q4(f)
June 2019 · AS Paper 1 (Core Pure) · Q4
Mark scheme June 2019 Paper 1 (Core Pure) Q4
June 2019 · AS Paper 1 (Core Pure) · Q8
Mark scheme June 2019 Paper 1 (Core Pure) Q8(b)
June 2018 · AS Paper 1 (Core Pure) · Q4
Mark scheme June 2018 Paper 1 (Core Pure) Q4(b)